Marmaray has a 3.5 km immersed tunnel, YHT high-speed links Ankara-Konya-Istanbul and metros span 350 km in 5 cities. Platforms are 10-20 m deep, trains carry 200-250 pax/car. NFPA 130 mandates tunnel jet fans 3 m/s, the 4 min egress rule, platform smoke layering and station sprinklers.

Rail Hazard

Tunnel Jet Fan

4 min Egress

Platform Smoke

Turkey Rail

Train with SprinkCalc

SprinkCalc sizes train station jet fans 3 m/s, NFPA 130 4 min egress, platform 2.5 m clear layering and tunnel sprinkler layout.

Download SprinkCalc on the App Store
Sources & Further Reading

NFPA 130, NFPA 502, EN 45545, UIC 779, TCDD Marmaray. NFPA 130 Fixed Guideway Transit and Passenger Rail Systems.

FS

Fatih Selvi

Mechanical engineer and software developer. MEP and fire protection experience.